Energy and decarbonization

Energy and decarbonization, engineered in house

Energy modelling sits inside the design team, so performance targets shape equipment selection and control sequences instead of being audited after the fact.

We design from real data, not from precedent

Loads are calculated, not inherited. Systems are modelled against how the building will actually be used, verified in commissioning, and reviewed on trend data once it is occupied.

Zero Carbon targets Compliance modelling and documentation
LEED support Modelling and documentation
Energy analysis Measure comparison and lifecycle cost
Decarbonization strategy Electrification and heat-pump pathways
BIM coordination Revit · Leica · JOBYO
A large distribution centre set in open fields — a carbon-neutral industrial site
Method

How performance is held

01

Load and capacity study

Heating and cooling loads, ventilation rates and an assessment of existing plant — completed before any equipment is selected.

02

Energy model

Consumption modelled against real occupancy and schedules, with measures compared on capital and operating cost together.

03

Sequences of operation

Written control sequences, points list and alarm strategy — the document the building is actually run by.

04

Commissioning and trend review

Balancing report, verified sequences, operator training at handover, and a trend review after the first season.

System animations

The systems in motion

Two animated schematics from a hotel project: a central domestic hot water plant charged by heat recovery, and the exhaust-and-makeup-air system that feeds it. Annotations are in French.

Central domestic hot water plant
Heat recovered from building exhaust preheats the domestic hot water. A gas boiler finishes and stands by as backup.
Exhaust recovery — hot water and makeup air
One recovery heat pump moves energy from extracted air into the hot water plant and tempers the fresh makeup air.
Construction technology

Coordinated before it is built

01

BIM — Revit

Mechanical models coordinated with structure, architecture and electrical from the slab phase, so clashes are resolved on screen.

02

Leica

Site survey and technical coordination, so what is modelled matches what is standing.

03

JOBYO

Project management carrying schedule, site reporting and closeout documentation in one place.

Top-down view of in-slab mechanical distribution laid out before a concrete pour
In-slab distribution, set before the pour
Coordinated early

Performance is decided before the concrete

Distribution routed and sleeved at the slab stage cannot be corrected later. Coordinating it in the model, then verifying it on site before the pour, is what keeps an energy target achievable once the building is closed in.